OMM

IDA
IDA Decoupling
HUPX IDA - [IDA_JOINT_07]: IDA Partial Decoupling
 

Dear Member,

Due to technical reasons or market issues, the following area is decoupled from the auction IDA2:

 

  • EPEX - IDA (NL, BE, FR, DE/LU, AT, PL, NO, SE, FI, DK)
  • EPEX - BSP - CORE - IDA (SI)
  • EPEX - HUPX - CORE - IDA (HU)
  • OTE (CZ)
  • EMCO - Nord Pool IDA Nordic Baltic (NO, SE, FI, DK, LT, LI, EE)
  • EMCO - Nord Pool IDA Core (NL, BE, FR, DE/LU, AT, PL)
  • EMCO - IBEX - IDA (BG)
  • EMCO - CROPEX - IDA (HR)
  • OPCOM - OKTE (SK)
  • OPCOM (RO)
  • TGE - Poland - IDA (PL)

The respective Intraday Continuous markets remain open for trading and can be used as fallback.

Reminder: Cross-border coupling is halted in XBID until at least 30 minutes after the Order Book closure time of the given IDA auction.

 Disclaimer: The timings are expressed as CEST timings.

DAM
Warning - Issue with DAM auction
HUPX IDA3 - [POST_ExC_IDA_JOINT_09]: Further information on the IDA Cancellation

Dear Market Participant, 
 
You have received earlier today a communication regarding IDA Cancelation. This message was sent at 10:30 to warn you that the IDA 3 DD 03072024 Session was cancelled.
 
This IDA Cancelation was caused by a technical issue. 
 
We would like to inform you that the next IDA Session is expected to be run under normal circumstances. 
 
 
We apologize for any inconvenience that this may have caused and we thank you for your understanding. 

 

Disclaimer: The timings are expressed as CEST timings. 

IDA
Warning - Issue with IDA
HUPX IDA - [IDA_JOINT_08]: Delay in IDA Results publication
 

Dear Member,

Please be aware that the publication of the Results for auction IDA3 is delayed until further notice.

The IDA Results will be published as soon as they are available.

DAM
Warning - Issue with DAM auction
[HUPX ETS]: Connection to ETS

Dear Member,

Some of you might have been disconnected, please be informed that you can re-connect now.

You do not need to call us - you will be informed per email if any further actions are required.

We apologize for the inconvenience this may cause.

DAM
Further Delay of the Market Coupling Session
[ExC_03b]: Further delay of the Market Coupling Session

Dear Member,

Please be aware that the Market Coupling Session is delayed.

Therefore, the Market Coupling Session encounters a risk of Full Decoupling.

If the Final Market Coupling Results are still not available at 14:20 (CET), another message will be sent out in order to announce the Full Decoupling.

 

For the Nordic region, be aware that in case of SDAC Full Decoupling, the Nordic NEMOs and Bidding Areas need to remain coupled. The Nordic NEMOs shall attempt the running of a Nordic Regional Coupling.

Disclaimer: The Timings are expressed as CET timings.

DAM
Partial Decoupling - Reopening of the Order Books
[ExC_04a]: Partial Decoupling - Reopening of the order books

Dear all,

 

Due to technical reasons or market issues, the following area is decoupled from the Market Coupling:

 

 

Impact of VB area

(PMB Virtual Broker)

Decoupled NEMO Hubs

Impacted BZs

Corresponding Decoupled Interconnectors

Fallback solution

EPEX - Core

EPEX (FR, BE, NL, AT, DE/LU, PL)

N/A

N/A

N/A

EMCO - Nord Pool

EPEX - Nordic

EMCO (NO, DK, SE, FI)

 

EPEX (NO, DK, SE, FI)

N/A

Nordic Internal Borders (NO-SE, NO-DK, NO-NO, NO-FI, DK-SE, DK-DK, SE-FI, SE-SE)

Baltic internal borders (EE-LV, LV-LT, ERI-EE, LV-LRE, LV-LRI, LT-LBE, LT-LBI)

NO2-NL (NorNed)

NO2-DE (NordLink)

DK1-DE

DK1-NL (COBRA Cable)

DK2-DE

SE4-DE (Baltic Cable)

PL-SE4

SE4-LT

PL-LT

EE-FI

Regional coupling

 

Regional coupling

 

Shadow Auction

Shadow Auction

Shadow Auction

Shadow Auction

Shadow Auction

Back to owner

Back to owner

Intraday

Back to owner

Intraday

 

 

 

As a consequence of the Partial Decoupling, the NEMO order books for the areas remained coupled will reopen at 13:10 (CET) for exactly 15 minutes.

For the areas that remain coupled, please follow the market coupling rules as usual.
For the decoupled area, please follow the applicable fallback rules.

This issue does not impact on SEMOpx auction trading, except in the potential for a delay in the publication of the SEM final Day-ahead auction results.

If the decoupling concerns the Nordic region: 
The Nordic NEMOs shall attempt the running of a Nordic Regional Coupling as of 14:50, with the aim of having Market Coupling Results available no later than 20:00. 
The Nordic order books will be reopened for 20 min at a later time which shall be communicated later in the afternoon in a separate message.

Disclaimer: The Timings are expressed as CET timings.
---------------------------------------------------------------------------------------------------------------
Please be aware that for the areas remaining coupled no Second Auction will be triggered if price thresholds are reached following the Partial Decoupling. 
This measure aims at avoiding a Full Decoupling due to insufficient time left to perform the Second Auction. 
Therefore, please use the opportunity of adjusting your orders during the 15 minutes communicated above, considering that decoupling situations are likely to determine the occurrence of extreme prices.

 

DAM
ETS issue solved
[HUPX ETS] Technical issue resolved - Connect to ETS

[HUPX ETS] Technical issue resolved - Connect to ETS

Dear Member,

Please be informed that the ETS trading system is NOW ACCESSIBLE.

You can now log in into the ETS Trading system. Due to an expected high number of simultaneous connections, please note that log in to ETS may take a little longer than usual.

The Orderbook for HUPX will be closed at 12:20. 

We apologize for any inconvenience caused.

DAM
Warning - Issue with DAM auction
[HUPX ETS] Technical issue investigation ongoing - Postponing Orderbook closure

[HUPX ETS] Technical issue investigation ongoing - Postponing Orderbook closure

Dear Member,

Please be informed that the ETS trading system is still NOT ACCESSIBLE due to a technical issue.

We are working on solving the issue.

The Orderbook closure for HUPX will be postponed until at least 12:20.

You do not need to call us - you will be informed per email about the issue.

We apologize for the inconvenience this may cause.