OMM
Dear Member,
Please be aware that the publication of the Results for auction IDA1 is delayed until further notice.
The IDA Results will be published as soon as they are available.
Dear Member,
Due to technical reasons or market issues, the following area is decoupled from the auction IDA2:
- EPEX - IDA (NL, BE, FR, DE/LU, AT, PL, NO, SE, FI, DK)
- EPEX - BSP - CORE - IDA (SI)
- EPEX - HUPX - CORE - IDA (HU)
- OTE (CZ)
- EMCO - Nord Pool IDA Nordic Baltic (NO, SE, FI, DK, LT, LI, EE)
- EMCO - Nord Pool IDA Core (NL, BE, FR, DE/LU, AT, PL)
- EMCO - IBEX - IDA (BG)
- EMCO - CROPEX - IDA (HR)
- OPCOM - OKTE (SK)
- OPCOM (RO)
- TGE - Poland - IDA (PL)
The respective Intraday Continuous markets remain open for trading and can be used as fallback.
Reminder: Cross-border coupling is halted in XBID until at least 30 minutes after the Order Book closure time of the given IDA auction.
Disclaimer: The timings are expressed as CEST timings.
Dear Market Participant,
You have received earlier today a communication regarding IDA Cancelation. This message was sent at 10:30 to warn you that the IDA 3 DD 03072024 Session was cancelled.
This IDA Cancelation was caused by a technical issue.
We would like to inform you that the next IDA Session is expected to be run under normal circumstances.
We apologize for any inconvenience that this may have caused and we thank you for your understanding.
Disclaimer: The timings are expressed as CEST timings.
Dear Member,
Due to technical reasons or market issues, the auction IDA3 was cancelled.
Dear Member,
Please be aware that the publication of the Results for auction IDA3 is delayed until further notice.
The IDA Results will be published as soon as they are available.
Dear Member,
Some of you might have been disconnected, please be informed that you can re-connect now.
You do not need to call us - you will be informed per email if any further actions are required.
We apologize for the inconvenience this may cause.
Dear Member,
Please be aware that the Market Coupling Session is delayed.
Therefore, the Market Coupling Session encounters a risk of Full Decoupling.
If the Final Market Coupling Results are still not available at 14:20 (CET), another message will be sent out in order to announce the Full Decoupling.
For the Nordic region, be aware that in case of SDAC Full Decoupling, the Nordic NEMOs and Bidding Areas need to remain coupled. The Nordic NEMOs shall attempt the running of a Nordic Regional Coupling.
Disclaimer: The Timings are expressed as CET timings.
Dear all,
Due to technical reasons or market issues, the following area is decoupled from the Market Coupling:
|
Impact of VB area (PMB Virtual Broker) |
Decoupled NEMO Hubs |
Impacted BZs |
Corresponding Decoupled Interconnectors |
Fallback solution |
|
EPEX - Core |
EPEX (FR, BE, NL, AT, DE/LU, PL) |
N/A |
N/A |
N/A |
|
EMCO - Nord Pool EPEX - Nordic |
EMCO (NO, DK, SE, FI)
EPEX (NO, DK, SE, FI) |
N/A |
Nordic Internal Borders (NO-SE, NO-DK, NO-NO, NO-FI, DK-SE, DK-DK, SE-FI, SE-SE) Baltic internal borders (EE-LV, LV-LT, ERI-EE, LV-LRE, LV-LRI, LT-LBE, LT-LBI) NO2-NL (NorNed) NO2-DE (NordLink) DK1-DE DK1-NL (COBRA Cable) DK2-DE SE4-DE (Baltic Cable) PL-SE4 SE4-LT PL-LT EE-FI |
Regional coupling
Regional coupling
Shadow Auction Shadow Auction Shadow Auction Shadow Auction Shadow Auction Back to owner Back to owner Intraday Back to owner Intraday |
As a consequence of the Partial Decoupling, the NEMO order books for the areas remained coupled will reopen at 13:10 (CET) for exactly 15 minutes.
For the areas that remain coupled, please follow the market coupling rules as usual.
For the decoupled area, please follow the applicable fallback rules.
This issue does not impact on SEMOpx auction trading, except in the potential for a delay in the publication of the SEM final Day-ahead auction results.
If the decoupling concerns the Nordic region:
The Nordic NEMOs shall attempt the running of a Nordic Regional Coupling as of 14:50, with the aim of having Market Coupling Results available no later than 20:00.
The Nordic order books will be reopened for 20 min at a later time which shall be communicated later in the afternoon in a separate message.
Disclaimer: The Timings are expressed as CET timings.
---------------------------------------------------------------------------------------------------------------
Please be aware that for the areas remaining coupled no Second Auction will be triggered if price thresholds are reached following the Partial Decoupling.
This measure aims at avoiding a Full Decoupling due to insufficient time left to perform the Second Auction.
Therefore, please use the opportunity of adjusting your orders during the 15 minutes communicated above, considering that decoupling situations are likely to determine the occurrence of extreme prices.
[HUPX ETS] Technical issue resolved - Connect to ETS
Dear Member,
Please be informed that the ETS trading system is NOW ACCESSIBLE.
You can now log in into the ETS Trading system. Due to an expected high number of simultaneous connections, please note that log in to ETS may take a little longer than usual.
The Orderbook for HUPX will be closed at 12:20.
We apologize for any inconvenience caused.