On 14th August 2015, the Commission Regulation (EU) No 2015/1222 of 24 July 2015 establishing a Guideline on Capacity Allocation and Congestion Management (CACM Regulation) came into force. 

On 14th December 2015, HUPX has been designated by the Hungarian Energy and Public Utility Regulatory Authority in accordance with article 4 of the CACM Regulation as a Nominated Electricity Market Operator (NEMO) for a period of 4 years, in order to perform the single day-ahead and intraday coupling in Hungary.

On 12th November 2019, HUPX has once again been designated by the Hungarian Energy and Public Utility Regulatory Authority in accordance with article 4 of the CACM Regulation as a Nominated Electricity Market Operator (NEMO) for an indefinite period, in order to continue to perform the single day-ahead and intraday coupling in Hungary.

2755-2019 sz. HEA decision about NEMO status

For more information please go to the NEMO Committee webpage: www.nemo-committee.eu

In accordance with CACM the following materials have been published:

ACER Decision on Algorithm methodology: Annex I_30.01.2020

ACER Decision on Algorithm methodology: Annex II_30.01.2020

ACER Decision on Algorithm methodology: Annex III_30.01.2020

ACER Decision on Algorithm methodology: Annex IV_30.01.2020

ACER Decision on Algorithm methodology: Annex V_30.01.2020

ACER Decision on Algorithm methodology: Annex I_26.07.2018

ACER Decision on Algorithm methodology: Annex II_26.07.2018

ACER Decision on Algorithm methodology: Annex III_26.07.2018

All NEMO proposal for the MCO Plan

DA ID Backup Methodologies

DA Products Proposal 

ID Products Proposal_30.01.2020

ID Products Proposal_13.11.2017

Harmonised maximum and minimum clearing prices for single day-ahead coupling

Harmonised maximum and minimum clearing prices for single intraday coupling

 All NEMO Committee: CACM Annual Report 2018 - press release

 All NEMO Committee: CACM Annual Report 2018