Negyedórák K 06.25 Sze 06.26 Cs 06.27 P 06.28 Szo 06.29 V 06.30 H 07.01
QH1 EUR/MWh 29,54 121,16 117,41 154,20 188,67 157,05 -
MW 65,5 5,0 8,1 10,0 4,3 4,0 -
QH2 EUR/MWh 20,86 121,20 93,74 148,70 188,00 141,55 -
MW 62,9 0,6 7,0 10,4 5,0 3,0 -
QH3 EUR/MWh 123,80 135,10 105,60 131,70 162,99 126,45 -
MW 16,0 3,0 10,0 13,0 11,7 7,0 -
QH4 EUR/MWh 189,00 59,20 66,05 111,11 151,51 51,86 -
MW 0,0 3,0 4,0 13,5 14,0 8,7 -
QH5 EUR/MWh 99,60 164,45 143,20 178,70 153,75 137,20 -
MW 23,0 2,0 3,0 5,5 3,5 4,8 -
QH6 EUR/MWh 92,40 106,45 116,20 148,59 152,25 137,20 -
MW 23,0 0,1 3,0 5,0 7,0 4,8 -
QH7 EUR/MWh 86,40 111,35 88,70 117,46 123,22 59,72 -
MW 25,0 0,7 2,0 4,0 10,0 10,0 -
QH8 EUR/MWh 76,60 49,70 53,41 109,96 94,85 40,65 -
MW 25,0 3,7 0,0 4,0 11,5 6,5 -
QH9 EUR/MWh 94,81 106,30 110,25 118,34 125,84 126,30 -
MW 0,0 0,4 2,0 10,0 14,0 4,8 -
QH10 EUR/MWh 83,36 98,80 107,00 118,40 125,84 126,30 -
MW 0,0 0,4 3,0 13,0 14,0 4,8 -
QH11 EUR/MWh 80,52 104,80 103,00 97,13 89,22 111,09 -
MW 2,0 2,6 5,0 12,3 10,0 5,0 -
QH12 EUR/MWh 80,52 97,30 87,92 89,63 87,17 97,16 -
MW 2,0 2,6 6,0 12,3 10,0 10,0 -
QH13 EUR/MWh 84,47 127,10 82,50 138,45 129,11 130,60 -
MW 0,0 2,2 6,0 4,7 13,8 5,4 -
QH14 EUR/MWh 80,30 70,30 106,72 115,30 129,11 107,94 -
MW 0,0 3,2 7,1 4,7 13,8 5,1 -
QH15 EUR/MWh 94,01 104,60 79,91 115,30 81,64 96,95 -
MW 2,0 2,2 6,0 4,7 2,0 4,0 -
QH16 EUR/MWh 85,23 67,60 81,90 115,30 82,06 82,15 -
MW 0,0 3,0 6,0 4,7 4,0 4,0 -
QH17 EUR/MWh 75,00 116,20 99,18 112,20 89,55 86,24 -
MW 2,0 3,2 9,7 10,0 1,0 8,8 -
QH18 EUR/MWh 118,80 117,70 99,18 126,13 94,05 86,24 -
MW 4,0 3,0 9,7 5,0 1,0 8,8 -
QH19 EUR/MWh 76,40 91,40 78,79 115,60 113,13 84,73 -
MW 2,0 0,2 6,0 4,4 4,0 8,8 -
QH20 EUR/MWh 81,80 68,53 84,14 118,80 116,00 43,59 -
MW 2,0 6,0 6,0 2,0 4,0 5,0 -
QH21 EUR/MWh 81,23 121,75 58,00 118,89 84,15 100,10 -
MW 7,9 3,5 10,0 10,0 1,0 5,9 -
QH22 EUR/MWh 86,63 73,75 90,40 111,99 124,91 85,06 -
MW 7,9 3,5 6,0 7,6 6,8 5,0 -
QH23 EUR/MWh 96,03 53,87 101,40 118,91 93,43 58,01 -
MW 5,9 3,6 6,0 3,0 10,3 2,0 -
QH24 EUR/MWh 118,47 68,21 109,00 95,75 93,07 8,16 -
MW 2,1 7,2 6,0 5,1 21,4 7,0 -
QH25 EUR/MWh 190,00 68,83 75,21 99,91 100,63 81,20 -
MW 13,0 3,8 13,0 2,0 10,0 2,0 -
QH26 EUR/MWh 84,66 83,86 114,94 141,15 110,00 79,84 -
MW 10,0 10,0 6,0 2,0 4,0 1,0 -
QH27 EUR/MWh 74,16 83,54 140,20 134,40 87,99 69,99 -
MW 25,0 5,1 8,9 4,0 10,9 1,7 -
QH28 EUR/MWh 87,96 106,35 144,00 165,15 78,11 11,74 -
MW 17,2 0,6 8,3 4,9 11,1 7,4 -
QH29 EUR/MWh 210,57 204,50 153,31 188,52 123,68 93,53 -
MW 1,9 0,5 10,0 4,0 7,0 3,3 -
QH30 EUR/MWh 149,56 113,46 141,31 144,18 96,82 71,55 -
MW 2,0 5,5 10,0 1,9 5,0 3,3 -
QH31 EUR/MWh 57,00 82,65 115,75 96,43 65,58 -21,02 -
MW 0,4 3,0 10,0 2,0 7,6 3,1 -
QH32 EUR/MWh 56,00 60,05 110,00 81,25 59,07 0,78 -
MW 0,6 3,2 10,0 0,5 10,8 2,0 -
QH33 EUR/MWh 162,80 197,80 163,50 124,85 102,28 54,24 -
MW 3,8 0,0 5,5 15,6 10,0 7,8 -
QH34 EUR/MWh 117,60 165,00 143,20 110,70 75,07 31,57 -
MW 4,0 0,0 7,0 16,0 7,0 7,4 -
QH35 EUR/MWh 55,00 68,98 97,60 68,59 44,22 -13,44 -
MW 2,0 0,0 6,0 16,2 5,0 5,0 -
QH36 EUR/MWh 53,00 68,35 115,71 73,90 26,20 -31,58 -
MW 2,0 0,0 10,0 19,5 9,0 3,0 -
QH37 EUR/MWh 59,50 175,75 136,10 113,60 75,07 25,99 -
MW 10,0 1,5 7,8 7,4 10,0 9,7 -
QH38 EUR/MWh 42,50 148,65 116,57 88,38 56,17 24,09 -
MW 4,0 2,0 8,0 7,7 13,9 9,9 -
QH39 EUR/MWh 95,00 88,60 98,80 49,71 19,88 -9,98 -
MW 4,0 2,0 10,0 6,5 9,0 4,0 -
QH40 EUR/MWh 95,00 67,00 71,90 45,00 -24,73 -31,30 -
MW 2,0 4,0 10,0 10,0 9,0 4,0 -
QH41 EUR/MWh 79,10 156,75 113,36 64,88 38,54 20,65 -
MW 6,0 0,0 8,5 16,5 20,0 17,0 -
QH42 EUR/MWh 70,81 145,60 113,27 51,42 18,58 12,82 -
MW 4,0 0,0 8,7 16,6 24,0 14,0 -
QH43 EUR/MWh 79,22 118,78 98,75 25,75 -0,88 -4,51 -
MW 6,0 0,0 10,0 16,7 24,0 14,0 -
QH44 EUR/MWh 60,92 121,94 107,15 0,06 -31,27 -32,96 -
MW 6,0 0,0 14,0 16,9 20,0 10,0 -
QH45 EUR/MWh 89,20 139,30 105,24 75,05 29,65 10,07 -
MW 6,0 0,0 9,6 9,9 32,0 13,0 -
QH46 EUR/MWh 89,26 139,15 105,24 58,50 22,64 10,04 -
MW 6,0 0,0 9,6 10,0 39,0 14,0 -
QH47 EUR/MWh 101,54 122,00 105,72 64,71 -9,39 -1,24 -
MW 9,1 0,0 8,8 10,0 29,0 14,0 -
QH48 EUR/MWh 103,10 118,93 105,81 63,51 -44,18 -59,91 -
MW 9,1 0,0 12,1 12,8 32,2 10,6 -
QH49 EUR/MWh 88,60 127,20 105,64 78,17 23,65 27,41 -
MW 10,0 5,0 12,5 13,6 30,0 7,0 -
QH50 EUR/MWh 105,94 132,30 105,99 73,70 -5,32 2,82 -
MW 14,0 5,0 11,7 14,0 21,0 1,0 -
QH51 EUR/MWh 103,69 131,40 97,60 67,14 0,07 -12,65 -
MW 14,0 5,6 14,0 14,3 23,9 1,0 -
QH52 EUR/MWh 102,94 131,40 82,50 59,75 -18,80 -18,90 -
MW 14,0 5,6 14,0 14,5 24,0 1,0 -
QH53 EUR/MWh 105,00 126,43 102,77 98,83 24,34 17,64 -
MW 14,0 0,0 12,2 7,4 33,2 14,0 -
QH54 EUR/MWh 105,00 132,00 103,37 98,83 -18,99 -37,30 -
MW 14,0 0,0 10,8 7,4 24,0 3,6 -
QH55 EUR/MWh 105,75 132,00 106,65 98,83 -29,63 -16,91 -
MW 14,0 0,0 7,0 7,4 24,0 4,0 -
QH56 EUR/MWh 104,25 132,10 104,01 98,91 24,39 18,24 -
MW 14,0 0,0 9,3 7,2 33,1 14,0 -
QH57 EUR/MWh 58,00 23,27 59,79 38,60 -16,36 -18,07 -
MW 8,0 6,4 15,5 10,0 15,0 10,0 -
QH58 EUR/MWh 58,10 37,65 59,83 38,93 -16,36 -51,83 -
MW 8,0 9,3 15,5 10,1 15,0 7,9 -
QH59 EUR/MWh 58,20 52,89 72,80 62,19 0,10 21,02 -
MW 8,0 8,8 16,4 15,0 18,0 14,0 -
QH60 EUR/MWh 84,41 58,43 99,71 164,05 27,39 7,69 -
MW 12,0 10,0 16,6 22,6 23,2 10,1 -
QH61 EUR/MWh 94,96 115,86 88,96 82,45 17,14 -33,13 -
MW 10,0 12,0 14,0 14,0 10,0 10,0 -
QH62 EUR/MWh 95,77 118,52 115,44 114,60 27,12 -1,02 -
MW 10,0 5,0 10,7 12,6 7,0 14,0 -
QH63 EUR/MWh 117,35 142,10 116,14 143,50 24,93 -1,79 -
MW 14,0 4,0 9,0 4,5 4,0 11,0 -
QH64 EUR/MWh 119,92 165,48 117,55 177,50 37,62 19,98 -
MW 17,0 1,3 8,9 4,5 11,0 11,0 -
QH65 EUR/MWh 211,00 104,46 79,80 51,30 8,29 7,25 -
MW 10,0 10,0 10,8 10,6 10,0 10,0 -
QH66 EUR/MWh 76,80 133,76 115,62 86,00 52,84 48,70 -
MW 20,0 5,0 10,0 10,0 9,7 6,3 -
QH67 EUR/MWh 74,00 175,45 121,02 165,33 34,80 52,85 -
MW 39,0 3,4 8,3 15,8 4,0 3,3 -
QH68 EUR/MWh 88,60 178,80 127,00 171,67 64,31 75,79 -
MW 41,0 0,6 8,0 12,0 4,9 3,7 -
QH69 EUR/MWh 113,08 131,59 89,51 51,10 117,30 36,23 -
MW 83,3 10,3 14,0 10,6 13,3 14,2 -
QH70 EUR/MWh 100,96 133,86 106,63 81,05 39,98 18,80 -
MW 80,0 5,0 10,0 10,6 2,0 5,0 -
QH71 EUR/MWh 139,60 179,85 124,14 185,17 99,40 80,14 -
MW 84,0 3,0 8,1 14,5 3,2 4,0 -
QH72 EUR/MWh 178,27 216,30 127,48 187,17 144,45 91,29 -
MW 88,0 0,7 8,1 11,5 3,1 5,0 -
QH73 EUR/MWh 276,76 111,55 63,05 19,76 61,65 44,08 -
MW 167,2 2,0 8,3 10,0 1,0 1,3 -
QH74 EUR/MWh 336,80 98,25 82,45 60,70 165,64 120,94 -
MW 159,0 2,0 5,0 10,2 12,5 11,8 -
QH75 EUR/MWh 408,00 239,50 170,40 181,40 207,80 158,05 -
MW 159,0 0,5 6,4 11,6 2,4 2,9 -
QH76 EUR/MWh 418,50 336,25 216,77 189,50 282,18 217,55 -
MW 159,0 0,5 6,4 11,5 3,0 2,9 -
QH77 EUR/MWh 104,11 141,15 197,14 125,55 160,60 44,51 -
MW 299,4 0,3 0,0 15,2 1,0 10,1 -
QH78 EUR/MWh 33,00 148,15 153,45 70,63 232,97 141,51 -
MW 289,4 0,3 0,0 15,0 7,0 12,8 -
QH79 EUR/MWh 120,88 201,10 274,12 173,16 300,18 158,79 -
MW 299,4 10,0 1,0 15,8 3,0 11,7 -
QH80 EUR/MWh 276,00 248,55 306,57 230,67 324,18 188,67 -
MW 311,4 11,5 3,0 15,8 3,0 12,1 -
QH81 EUR/MWh 257,00 225,64 350,96 173,35 217,23 81,36 -
MW 435,2 7,1 0,0 11,3 1,5 18,2 -
QH82 EUR/MWh 90,18 210,60 305,64 135,41 263,10 156,01 -
MW 418,2 7,2 10,4 10,1 4,9 18,1 -
QH83 EUR/MWh 136,73 233,03 300,00 187,67 286,53 173,08 -
MW 424,2 10,0 0,0 11,2 2,0 18,0 -
QH84 EUR/MWh 122,72 233,03 356,79 187,67 244,10 165,67 -
MW 424,2 10,0 1,1 11,2 1,8 18,0 -
QH85 EUR/MWh 303,32 328,60 333,95 232,67 270,90 218,10 -
MW 462,6 0,2 1,1 25,0 2,2 1,8 -
QH86 EUR/MWh 102,40 225,90 331,50 187,27 234,90 196,10 -
MW 457,6 5,8 1,5 25,0 2,2 1,8 -
QH87 EUR/MWh 64,03 135,47 247,29 100,00 237,77 149,42 -
MW 453,6 7,8 0,5 25,0 12,2 2,4 -
QH88 EUR/MWh 64,03 78,95 197,38 72,08 170,79 126,43 -
MW 453,6 0,8 10,1 27,0 10,0 5,0 -
QH89 EUR/MWh 220,07 143,82 217,09 202,71 189,55 175,00 -
MW 237,0 11,0 5,9 5,0 5,0 11,0 -
QH90 EUR/MWh 169,00 128,23 181,17 163,45 144,55 135,04 -
MW 239,0 6,6 5,2 5,0 5,0 10,0 -
QH91 EUR/MWh 44,67 119,20 107,98 91,72 144,60 117,41 -
MW 241,0 2,0 6,2 6,0 15,0 10,0 -
QH92 EUR/MWh 24,67 52,70 107,08 70,00 75,00 31,16 -
MW 235,0 2,6 9,2 7,0 5,0 8,0 -
QH93 EUR/MWh 126,82 198,75 160,50 157,50 117,51 187,90 -
MW 104,0 0,0 5,5 7,0 8,6 2,2 -
QH94 EUR/MWh 88,60 87,40 125,00 131,54 119,31 156,90 -
MW 95,0 0,0 5,0 6,0 8,6 4,0 -
QH95 EUR/MWh 88,60 93,75 106,90 83,02 114,88 121,00 -
MW 97,0 0,0 6,0 6,0 10,0 4,0 -
QH96 EUR/MWh 72,02 45,50 65,02 70,51 59,04 103,62 -
MW 95,0 0,0 5,0 2,0 4,0 4,0 -
Negyedórás árak és mennyiségek
Negyedórák K 06.25 Sze 06.26 Cs 06.27 P 06.28 Szo 06.29 V 06.30 H 07.01
QH1 EUR/MWh 92,27 64,62 129,62 172,80 188,00 141,50 -
MW 280,0 40,0 3,0 1,0 1,0 1,0 -
QH2 EUR/MWh 84,85 98,14 117,50 151,30 167,50 127,00 -
MW 280,0 39,0 2,0 1,0 2,0 2,0 -
QH3 EUR/MWh 60,36 45,86 117,00 112,00 141,00 90,00 -
MW 264,9 39,0 0,0 3,0 3,0 3,0 -
QH4 EUR/MWh 48,76 22,71 64,00 79,05 82,67 60,00 -
MW 249,6 39,0 0,0 1,0 1,0 2,0 -
QH5 EUR/MWh 73,53 98,74 99,97 180,31 158,75 131,25 -
MW 280,9 29,2 6,0 3,0 3,0 3,0 -
QH6 EUR/MWh 64,28 68,31 85,20 124,00 149,50 127,00 -
MW 275,0 29,2 3,0 3,0 3,0 2,0 -
QH7 EUR/MWh 70,60 37,89 76,89 89,00 104,50 64,37 -
MW 175,0 29,2 1,0 1,0 2,0 2,0 -
QH8 EUR/MWh 54,79 20,14 57,95 57,89 75,00 53,60 -
MW 175,0 30,0 2,0 2,0 1,0 2,0 -
QH9 EUR/MWh 76,38 83,36 89,25 109,69 104,71 111,50 -
MW 124,1 16,0 31,0 2,0 3,0 1,0 -
QH10 EUR/MWh 72,09 97,97 87,23 99,69 101,61 104,57 -
MW 125,0 15,1 31,0 2,0 3,0 2,1 -
QH11 EUR/MWh 49,15 40,32 82,51 92,19 97,45 81,69 -
MW 105,8 15,0 31,0 2,0 2,0 1,4 -
QH12 EUR/MWh 49,80 38,36 73,01 78,42 92,63 56,00 -
MW 95,0 16,0 33,0 1,0 3,0 2,0 -
QH13 EUR/MWh 69,87 79,78 83,18 112,10 107,42 61,99 -
MW 125,0 26,0 3,0 2,2 3,0 16,0 -
QH14 EUR/MWh 67,87 61,29 85,00 104,60 105,91 57,10 -
MW 125,0 26,0 3,0 2,2 2,0 15,0 -
QH15 EUR/MWh 59,94 38,57 76,95 104,60 95,99 58,71 -
MW 75,0 26,0 2,0 2,2 1,0 13,0 -
QH16 EUR/MWh 63,12 45,40 74,87 72,17 92,00 60,61 -
MW 74,4 28,1 1,0 1,0 3,0 11,8 -
QH17 EUR/MWh 50,93 53,79 71,74 81,50 100,19 54,09 -
MW 75,0 26,0 31,0 2,0 5,0 5,0 -
QH18 EUR/MWh 62,65 50,64 77,33 104,00 101,48 54,66 -
MW 75,0 26,0 31,0 2,0 5,0 3,0 -
QH19 EUR/MWh 72,03 68,57 81,60 79,32 95,87 55,81 -
MW 175,0 26,0 31,0 1,0 1,0 5,0 -
QH20 EUR/MWh 76,40 67,00 86,04 79,33 92,26 55,11 -
MW 227,6 30,0 34,0 3,0 3,0 3,0 -
QH21 EUR/MWh 56,07 47,97 69,89 103,93 98,85 54,39 -
MW 60,5 38,0 31,0 5,0 5,0 5,0 -
QH22 EUR/MWh 62,17 53,36 76,96 81,50 93,71 48,87 -
MW 58,8 38,0 32,0 3,0 2,0 3,0 -
QH23 EUR/MWh 87,12 52,71 87,00 78,13 94,58 43,47 -
MW 145,0 39,0 33,0 3,0 3,0 3,0 -
QH24 EUR/MWh 94,24 24,00 98,55 96,88 97,58 32,13 -
MW 145,0 40,0 37,0 6,0 6,0 4,0 -
QH25 EUR/MWh 68,09 90,50 90,10 70,54 98,93 52,79 -
MW 45,0 8,0 2,8 3,0 1,0 1,0 -
QH26 EUR/MWh 81,14 96,21 142,90 171,21 90,74 40,20 -
MW 92,6 8,0 1,0 7,0 2,0 4,0 -
QH27 EUR/MWh 106,21 83,57 142,50 186,21 90,19 30,90 -
MW 94,2 8,0 1,0 7,0 3,0 3,0 -
QH28 EUR/MWh 112,00 55,14 152,00 169,63 76,98 19,32 -
MW 143,0 10,0 2,0 7,0 4,0 3,0 -
QH29 EUR/MWh 140,84 162,50 175,00 210,25 108,91 44,43 -
MW 41,0 6,0 31,0 0,0 5,0 5,2 -
QH30 EUR/MWh 107,24 135,35 158,13 150,75 89,46 15,00 -
MW 35,0 5,3 31,0 3,0 3,0 13,0 -
QH31 EUR/MWh 85,39 46,46 115,75 81,90 72,22 19,56 -
MW 8,0 5,2 31,5 2,0 4,0 2,0 -
QH32 EUR/MWh 74,53 43,69 91,12 67,24 59,87 3,21 -
MW 5,0 3,0 37,0 2,0 6,0 1,0 -
QH33 EUR/MWh 138,85 157,00 179,60 224,46 109,12 16,01 -
MW 30,0 5,0 2,0 21,0 10,0 12,0 -
QH34 EUR/MWh 85,39 121,49 108,57 172,29 76,71 -12,91 -
MW 35,6 4,1 1,9 21,0 10,0 11,0 -
QH35 EUR/MWh 74,53 53,56 89,43 112,07 55,25 16,59 -
MW 0,0 5,1 1,0 21,0 10,0 5,0 -
QH36 EUR/MWh 35,06 38,36 65,28 95,53 19,00 -1,58 -
MW 3,0 3,0 1,4 21,0 7,0 1,0 -
QH37 EUR/MWh 103,71 121,37 144,11 91,71 65,42 19,80 -
MW 15,0 4,6 3,8 4,0 21,0 5,0 -
QH38 EUR/MWh 61,51 103,76 112,21 63,63 11,95 8,46 -
MW 26,9 4,0 1,9 4,0 20,0 2,0 -
QH39 EUR/MWh 54,63 16,30 89,03 43,54 37,92 6,87 -
MW 5,0 3,9 3,0 1,0 23,0 2,0 -
QH40 EUR/MWh 25,02 2,72 71,00 25,84 4,71 -30,50 -
MW 5,0 3,9 0,0 2,0 21,0 2,0 -
QH41 EUR/MWh 74,28 92,32 133,60 46,29 27,16 13,73 -
MW 10,0 6,0 3,0 6,0 12,0 6,0 -
QH42 EUR/MWh 48,85 54,82 107,15 31,29 -17,13 0,75 -
MW 30,5 6,0 5,0 6,0 15,0 6,5 -
QH43 EUR/MWh 31,04 24,82 89,50 16,00 15,75 -12,43 -
MW 5,0 6,0 5,0 6,0 5,0 5,0 -
QH44 EUR/MWh 2,59 2,32 52,00 -24,85 -4,83 -23,90 -
MW 9,0 6,0 1,0 6,0 3,0 5,0 -
QH45 EUR/MWh 24,14 38,94 90,46 70,00 19,56 8,23 -
MW 106,7 15,0 3,0 5,0 20,0 6,5 -
QH46 EUR/MWh -7,24 30,28 81,25 53,00 -17,20 -8,23 -
MW 112,0 14,7 7,5 5,0 20,0 5,0 -
QH47 EUR/MWh 13,39 22,78 68,56 41,25 8,95 -11,15 -
MW 62,0 14,7 5,0 5,0 20,0 6,0 -
QH48 EUR/MWh -6,61 15,28 50,86 44,00 -7,66 -8,27 -
MW 63,0 14,7 9,0 6,0 20,0 6,0 -
QH49 EUR/MWh 12,68 20,95 83,17 68,50 18,10 15,84 -
MW 96,0 16,0 5,0 3,0 5,0 5,0 -
QH50 EUR/MWh -13,26 17,69 69,92 62,63 -15,90 -8,16 -
MW 101,0 16,0 6,0 3,0 6,0 6,0 -
QH51 EUR/MWh 6,69 13,94 56,92 59,50 4,80 -17,58 -
MW 96,0 16,0 6,0 5,0 6,0 6,0 -
QH52 EUR/MWh 5,60 13,94 52,50 69,37 -15,71 -0,69 -
MW 96,0 16,0 9,0 6,0 6,0 6,0 -
QH53 EUR/MWh 10,55 22,70 73,28 65,75 13,95 3,80 -
MW 96,0 15,1 6,0 5,0 3,0 6,0 -
QH54 EUR/MWh 5,31 22,71 73,30 69,50 -4,66 -8,98 -
MW 96,0 15,0 6,0 5,0 5,0 6,0 -
QH55 EUR/MWh 2,81 30,21 78,02 73,25 -11,55 -8,41 -
MW 96,0 15,0 6,0 5,0 5,0 6,0 -
QH56 EUR/MWh -2,67 -2,43 72,97 51,50 -5,82 -8,41 -
MW 95,0 15,0 4,1 5,0 8,0 6,0 -
QH57 EUR/MWh -9,52 7,69 64,05 30,62 -4,80 -31,34 -
MW 91,8 9,1 6,0 10,0 19,0 5,0 -
QH58 EUR/MWh 9,67 22,50 76,06 34,37 -3,69 -14,83 -
MW 90,0 10,0 6,0 10,0 16,0 5,0 -
QH59 EUR/MWh 7,18 30,11 85,00 61,00 -12,28 18,19 -
MW 90,0 10,0 6,0 13,0 16,0 6,0 -
QH60 EUR/MWh 32,85 30,11 102,89 134,00 15,17 19,99 -
MW 90,0 10,0 6,0 15,0 16,0 9,0 -
QH61 EUR/MWh 5,91 -0,04 62,00 7,40 -17,17 -5,15 -
MW 128,0 16,0 5,0 28,0 23,0 5,0 -
QH62 EUR/MWh 9,18 7,46 89,00 18,20 21,50 4,40 -
MW 126,0 16,0 5,0 28,0 30,0 5,0 -
QH63 EUR/MWh 2,74 35,21 108,28 89,66 -14,23 -7,32 -
MW 184,0 16,0 6,0 28,0 20,0 16,0 -
QH64 EUR/MWh 33,77 76,46 118,00 144,74 19,47 6,20 -
MW 134,0 16,0 6,0 28,3 20,0 16,0 -
QH65 EUR/MWh -0,10 1,25 68,30 5,52 -15,44 -42,60 -
MW 105,0 16,0 6,0 36,0 35,0 6,0 -
QH66 EUR/MWh 43,06 22,50 71,92 37,73 43,69 -1,26 -
MW 105,0 16,0 3,0 36,0 35,0 6,0 -
QH67 EUR/MWh 24,83 62,12 109,00 86,75 -4,44 15,64 -
MW 147,2 16,0 7,0 48,0 46,0 13,0 -
QH68 EUR/MWh 41,19 92,12 131,18 130,00 24,98 30,29 -
MW 124,5 16,0 6,0 47,0 46,0 13,0 -
QH69 EUR/MWh 25,09 16,69 98,14 66,43 16,70 -13,98 -
MW 286,0 9,0 0,0 5,0 26,0 6,0 -
QH70 EUR/MWh 55,66 35,44 106,93 74,25 62,09 17,63 -
MW 286,0 9,0 0,0 3,0 26,0 9,0 -
QH71 EUR/MWh 58,64 99,00 146,00 157,14 105,25 41,02 -
MW 331,5 9,0 0,0 2,3 28,5 16,0 -
QH72 EUR/MWh 85,61 128,87 185,75 202,50 118,50 60,21 -
MW 332,5 9,6 0,0 0,0 28,5 16,0 -
QH73 EUR/MWh 86,70 118,50 62,50 8,00 104,14 22,30 -
MW 270,0 6,0 0,0 5,0 6,0 36,0 -
QH74 EUR/MWh 72,75 133,50 98,50 53,00 135,64 47,90 -
MW 365,0 6,0 0,0 5,0 6,0 36,0 -
QH75 EUR/MWh 139,62 213,00 205,25 172,75 223,25 72,30 -
MW 366,0 3,0 0,0 5,0 0,0 46,0 -
QH76 EUR/MWh 141,97 251,24 229,90 241,07 283,75 86,70 -
MW 366,0 3,0 0,0 5,0 2,5 51,0 -
QH77 EUR/MWh 85,79 201,90 124,25 68,79 177,77 50,71 -
MW 387,0 13,0 0,0 10,0 6,6 39,0 -
QH78 EUR/MWh 130,73 216,64 135,50 98,57 209,21 70,20 -
MW 386,0 10,0 0,0 10,0 6,3 39,0 -
QH79 EUR/MWh 184,79 325,20 253,00 210,43 286,25 113,08 -
MW 387,0 7,0 0,0 10,0 0,0 49,1 -
QH80 EUR/MWh 247,76 326,10 289,00 240,60 314,00 120,51 -
MW 387,0 7,0 0,0 10,0 0,0 51,0 -
QH81 EUR/MWh 301,11 284,34 290,00 188,14 272,50 128,06 -
MW 85,2 6,9 0,0 25,0 2,0 13,4 -
QH82 EUR/MWh 313,80 306,53 270,50 124,66 262,00 117,07 -
MW 82,2 5,5 0,0 26,0 2,0 15,0 -
QH83 EUR/MWh 328,36 300,73 301,25 195,43 294,50 121,38 -
MW 85,2 5,0 0,0 25,0 0,0 13,4 -
QH84 EUR/MWh 325,91 307,73 301,25 147,16 283,00 157,65 -
MW 90,2 6,0 0,0 26,0 2,0 13,9 -
QH85 EUR/MWh 203,86 293,00 352,25 233,56 302,75 186,00 -
MW 270,0 2,0 0,0 10,0 0,0 5,0 -
QH86 EUR/MWh 176,77 244,09 337,00 195,43 272,50 195,36 -
MW 270,0 2,0 0,0 10,0 2,0 5,0 -
QH87 EUR/MWh 146,73 117,34 212,00 90,51 214,50 97,67 -
MW 269,5 3,0 0,0 11,5 3,0 5,0 -
QH88 EUR/MWh 113,58 80,40 153,00 66,33 139,00 70,73 -
MW 269,5 2,0 0,0 12,0 0,0 6,0 -
QH89 EUR/MWh 156,44 187,74 235,07 195,83 200,00 99,85 -
MW 335,0 8,9 0,0 7,0 20,0 15,0 -
QH90 EUR/MWh 110,31 142,71 215,00 165,44 177,10 97,52 -
MW 335,0 5,0 0,0 5,0 20,0 14,9 -
QH91 EUR/MWh 100,66 53,15 85,41 95,90 142,00 112,87 -
MW 335,0 5,0 1,0 5,0 23,0 3,0 -
QH92 EUR/MWh 72,59 20,40 70,24 72,96 52,50 100,00 -
MW 330,0 5,0 0,2 6,0 21,0 7,0 -
QH93 EUR/MWh 134,70 144,00 200,50 153,79 173,00 150,00 -
MW 236,0 5,0 0,0 10,0 0,0 5,0 -
QH94 EUR/MWh 113,00 104,93 152,00 113,00 134,00 106,20 -
MW 235,0 5,0 0,0 10,0 3,0 5,0 -
QH95 EUR/MWh 81,98 75,00 116,50 98,42 118,64 104,16 -
MW 235,0 5,0 0,0 10,0 3,0 6,3 -
QH96 EUR/MWh 70,15 16,07 81,26 93,60 59,03 72,65 -
MW 230,0 5,0 4,0 15,0 2,0 10,2 -
Negyedórás árak és mennyiségek
Negyedórák K 06.25 Sze 06.26 Cs 06.27 P 06.28 Szo 06.29 V 06.30 H 07.01
QH49 EUR/MWh - 64,94 79,37 92,55 10,88 - -
MW - 0,0 1,3 3,0 0,0 - -
QH50 EUR/MWh - 62,60 72,75 87,38 -15,45 - -
MW - 0,0 0,0 3,0 1,5 - -
QH51 EUR/MWh - 62,60 76,05 87,38 -1,20 - -
MW - 0,0 0,0 3,0 0,0 - -
QH52 EUR/MWh - 59,60 69,45 83,93 -3,80 - -
MW - 0,0 0,0 3,0 0,0 - -
QH53 EUR/MWh - 62,60 73,78 73,44 13,05 - -
MW - 0,0 0,0 3,0 0,0 - -
QH54 EUR/MWh - 62,60 68,95 76,89 -1,49 - -
MW - 0,0 0,0 3,0 0,0 - -
QH55 EUR/MWh - 65,60 72,76 89,70 0,60 - -
MW - 0,0 1,4 3,0 0,0 - -
QH56 EUR/MWh - 71,60 80,55 93,80 8,10 - -
MW - 0,0 0,0 0,0 0,0 - -
QH57 EUR/MWh - 32,92 54,02 74,83 -10,30 - -
MW - 0,0 0,0 3,0 0,0 - -
QH58 EUR/MWh - 32,98 76,20 80,01 -5,10 - -
MW - 0,0 0,0 3,0 0,0 - -
QH59 EUR/MWh - 83,00 89,40 96,60 15,90 - -
MW - 0,0 0,0 3,0 0,0 - -
QH60 EUR/MWh - 120,02 112,50 123,80 23,61 - -
MW - 0,0 0,0 0,0 5,0 - -
QH61 EUR/MWh - 32,49 36,30 68,90 -36,17 - -
MW - 3,0 0,0 7,7 0,0 - -
QH62 EUR/MWh - 43,93 69,30 89,60 -2,91 - -
MW - 3,0 0,0 7,7 0,0 - -
QH63 EUR/MWh - 102,30 99,30 124,17 28,80 - -
MW - 0,0 0,0 2,7 3,0 - -
QH64 EUR/MWh - 150,30 119,10 126,61 39,00 - -
MW - 0,0 0,0 0,0 10,0 - -
QH65 EUR/MWh - 51,00 59,10 61,95 -16,26 - -
MW - 0,0 0,0 36,5 0,0 - -
QH66 EUR/MWh - 74,87 80,40 103,30 27,97 - -
MW - 0,0 0,0 35,3 0,0 - -
QH67 EUR/MWh - 108,30 119,10 130,10 57,54 - -
MW - 0,0 0,0 33,0 3,0 - -
QH68 EUR/MWh - 138,30 145,50 139,70 70,74 - -
MW - 0,0 0,0 30,0 10,0 - -
QH69 EUR/MWh - 62,19 61,77 61,85 23,10 - -
MW - 0,0 3,0 4,1 0,0 - -
QH70 EUR/MWh - 77,20 81,57 89,48 55,80 - -
MW - 0,0 3,0 3,0 0,0 - -
QH71 EUR/MWh - 137,31 158,40 141,45 117,30 - -
MW - 3,0 3,0 0,0 0,0 - -
QH72 EUR/MWh - 155,31 223,90 234,47 133,80 - -
MW - 3,0 3,0 1,7 3,0 - -
QH73 EUR/MWh - 100,00 89,12 61,80 54,30 - -
MW - 0,0 10,0 0,0 0,0 - -
QH74 EUR/MWh - 107,70 128,72 77,73 85,50 - -
MW - 0,0 10,0 0,0 0,0 - -
QH75 EUR/MWh - 216,00 219,10 244,95 206,70 - -
MW - 0,0 10,0 0,0 0,0 - -
QH76 EUR/MWh - 276,30 251,10 295,93 283,90 - -
MW - 0,0 10,0 3,1 3,0 - -
QH77 EUR/MWh - 196,75 250,80 110,28 132,30 - -
MW - 10,0 15,0 0,0 0,0 - -
QH78 EUR/MWh - 207,25 271,34 141,45 163,80 - -
MW - 10,0 15,0 0,0 0,0 - -
QH79 EUR/MWh - 318,00 301,48 272,55 289,55 - -
MW - 10,0 15,0 0,0 0,0 - -
QH80 EUR/MWh - 378,00 336,40 337,81 321,05 - -
MW - 10,0 15,0 0,1 0,0 - -
QH81 EUR/MWh - 293,75 329,83 200,31 257,40 - -
MW - 3,0 6,0 5,0 0,0 - -
QH82 EUR/MWh - 263,70 329,83 172,71 257,40 - -
MW - 0,0 6,0 5,0 0,0 - -
QH83 EUR/MWh - 300,00 376,03 214,11 288,60 - -
MW - 0,0 6,0 5,0 0,0 - -
QH84 EUR/MWh - 270,17 332,35 200,31 280,80 - -
MW - 0,0 6,0 5,0 0,0 - -
QH85 EUR/MWh - 338,20 322,16 265,65 300,30 - -
MW - 0,0 5,0 0,0 0,0 - -
QH86 EUR/MWh - 287,90 308,96 238,05 269,10 - -
MW - 2,0 5,0 0,0 0,0 - -
QH87 EUR/MWh - 139,30 200,00 172,50 183,30 - -
MW - 5,0 15,0 0,0 0,0 - -
QH88 EUR/MWh - 71,72 125,61 93,15 138,22 - -
MW - 0,0 20,0 0,0 0,0 - -
QH89 EUR/MWh - 197,80 250,90 248,11 238,71 - -
MW - 10,0 3,0 0,1 0,0 - -
QH90 EUR/MWh - 140,00 190,28 169,05 186,90 - -
MW - 3,0 0,0 0,0 0,0 - -
QH91 EUR/MWh - 77,20 95,70 100,05 108,90 - -
MW - 3,0 0,0 0,0 0,0 - -
QH92 EUR/MWh - 65,00 86,11 79,35 85,50 - -
MW - 0,0 0,0 0,0 0,0 - -
QH93 EUR/MWh - 181,00 201,28 182,85 179,40 - -
MW - 0,0 0,0 0,0 0,0 - -
QH94 EUR/MWh - 125,00 125,00 134,55 101,40 - -
MW - 0,0 0,0 0,0 0,0 - -
QH95 EUR/MWh - 60,00 80,00 93,15 86,67 - -
MW - 3,0 0,0 0,0 0,0 - -
QH96 EUR/MWh - 54,00 70,00 77,70 70,59 - -
MW - 0,0 0,0 0,0 3,0 - -